Skip to main content

Kitchen Remodeling in Nashville, TN

If you’ll be living at home during the work, start by figuring out when the sink and range will be offline. McGrath helps Nashville homeowners coordinate cabinets, flooring, and finishes so they can review the sequence and who handles each step before demolition.

Light herringbone oak flooring beside wood cabinetry and large windows in the Modern Abode kitchen.

Perla Gris hardwood installation by McGrath for Modern Abode.

Cabinet and flooring coordination
Finish samples at our Franklin showroom
Trade responsibilities reviewed up front

What needs to happen before the kitchen comes out?

Start with a rough layout, the appliances you’re keeping, and the route people will use while work is underway. Then work through these decisions with your project team.

Plan a temporary setup and keep a path open

Decide where you’ll keep the refrigerator, set up a meal station, and wash dishes while the sink is disconnected. Ask where deliveries go and how the crew will protect the route through adjoining rooms. Keep work areas out of the household’s daily path where possible.

Name the trade responsible for each connection

Ask who removes the old cabinets, deals with discoveries underneath, and reconnects the sink, appliances, and lighting. If work is outside the base quote, ask how it will be priced and who schedules it. Keep those answers on a shared scope so your cabinet, flooring, and countertop teams are working from the same plan.

Confirm what has arrived and what can be checked

Check cabinet delivery and inspect the boxes and key pieces before setting the demo date. Put appliance, sink, and faucet models on the plan. Flag any flooring or walls you want to keep, then agree who will document surprises and approve changes once the room is open.

Rick Says: Settle the sink before templating

Want to know how long you’ll be without a kitchen sink? Before you book the countertop measure, ask when the base cabinets will be ready. Check whether your fabricator needs the actual sink and faucet or can work from the model’s cutout details. Then ask when the sink can be hooked up again. That’s the date to plan your temporary kitchen around.

Light Perla Gris herringbone beside a walnut-toned island and cabinets in the Modern Abode project.

Modern Abode kitchen. McGrath supplied and installed the Perla Gris flooring.

Project example: Plan the floor around the kitchen

Modern Abode worked with McGrath to select a prefinished engineered oak floor for an existing concrete slab. The photos show how the Perla Gris herringbone carries around the island and cabinetry. For a similar remodel, ask your team to confirm the slab preparation, pattern direction, and meeting points before cutting the first board.

A Brentwood homeowner on coordinating trades

Kristy Wheeler described working with McGrath on flooring, drywall, and appliance installation. She appreciated having a single team to answer questions and said Laura kept her informed through the work.

Put the handoffs on the schedule

Before demolition

Check deliveries, mark the items staying, and set up the temporary kitchen. Confirm who will disconnect utilities and remove existing materials.

After the room is open

Inspect the floor and walls. Confirm what needs repair and review any scope or schedule changes with the trades involved before work proceeds.

Before countertop measurement

Have the cabinet bases set and confirm what the fabricator needs on site. Coordinate the flooring sequence with the cabinet and flooring instructions for the materials you’ve chosen.

Before moving back in

Confirm who reconnects appliances and fixtures. Walk the finished kitchen to check cabinet operation, floor transitions, and any items that still need attention.

Questions to settle before work starts

Can we stay in the house during the remodel?

Ask which days the kitchen will be inaccessible and whether water or power will be interrupted elsewhere. Identify a temporary meal station and a protected path through the house, then plan around the days when your family needs to be out of the work area.

Will we have a working sink as soon as the cabinets are in?

Ask when the countertop will be measured and installed, when the sink can be fitted, and who makes the plumbing connections. Those may be separate appointments. Plan your temporary kitchen through the confirmed reconnection date.

What if removal exposes an uneven floor?

Document the condition and have the appropriate crew assess the cause and the preparation needed for your selected flooring. Ask for a written scope and timing update before that additional work starts.

Bring the layout and the schedule you need

Bring kitchen photos, any appliance models you know, and the parts of the room you want to keep. Tell us when the kitchen needs to be usable. We’ll help you decide what to select now and what needs a site check.

Flooring and cabinetry samples at McGrath Floor & Design’s Franklin showroom